国产v精品在线观看_日韩彼女中文字幕在线高清_2018AV天堂在线视频精品观看_日韩欧美精品一区第二区_亚洲区日韩偷拍中文字幕_欧美日韩色另类综合_欧美激情69性办公室_午夜精品在线免费观看_69寂寞少妇自慰冒白浆_国产91在线

Welcome to the official website of Wujiang Wuzhou Rubber & Plastic Co., Ltd.!

上一張 下一張

Everyone is searching: Coating | Calendering | Laminating

Wujiang Wuzhou Rubber&Plastics Co., Ltd.

Various styles customization following your requirements

Wujiang Wuzhou Rubber & Plastic Co., Ltd. is located in Shengze Town of Wujiang District in Suzhou City, the largest textile town in China. Situated at Luoqi Road of Shengze Town, we enjoy superior geographical environment and convenient transportation for our company is adjacent to the Province Highway S227, Sujiahang Expressway and other transportation routes.

Wujiang Wuzhou Rubber & Plastic Co., Ltd. established a textile factory in 1999. In 2000, we purchased PVC Calendering, coating and other finishing equipment and officially put these apparatus into production; with fixed assets of CNY 160 million yuan, our company has become a leading company in the finishing industry in Shengze town through healthy development. At present, our company has 2 PVC Calendering production lines and 5 coating machines, especially, our 3.6m wide-breadth coating machine and 2.8m wide-breadth coating machine are the only coating machines in Shengze town with the widest breadths.

Products

High cost-effective; let you feel at ease

Wujiang Wuzhou Rubber&Plastics Co., Ltd. produces products in tailor-made production plans according to customers' order requirements, can give ordinary fabrics new functions through coating, calendering, and laminating.

Coating series such as: silver coating, white coating, flame retardant, antibacterial, waterproof and moisture permeable, anti-ultraviolet, anti-static, etc.
Calendering series such as: luggage leather, clothing leather, raincoat leather, water bag leather, tent leather, etc.

Production equipment

In 2000, PVC Calendering, Coating and other finishing equipment were added

Refined Process flow

According to the formula, put the required raw and auxiliary materials into the high-speed mixer and mix them evenly for about 8 minutes, then enter the high-speed internal mixer, through the temperature control of 140 ℃-150 ℃, the preliminary plasticization takes about 8 minutes After that, it is sent from the hopper to the two rollers for open mixing, fully plasticized and then sent to the filter, through the multi-layer filter to remove the impurities contained in it, to ensure the quality of the PVC film, and finally sent to the Calendering host by the conveyor belt and controlled by the four rollers , To form a PVC film of the required thickness, and directly press it on the coated grey cloth through embossing rollers and rubber rollers, and directly wind up on the A-frame after cooling.

Through a complete set of Process flow, it is necessary to ensure that the thickness error of the PVC film is controlled within ±1 silk (1 mm = 100 silk), without trachoma, to ensure the color difference requirements, the peeling fastness between the PVC film and the gray fabric and other quality requirements.

Coating process

Spread the formulated coating glue directly on the fabric evenly with a spatula.?Adjust the tension of the grey fabric, press down the scraper, and adjust the angle of the scraper to control the amount of coating glue (g/m2). After drying at an oven temperature of about 160℃, it is directly wound on the A-frame after cooling.

Calendering process

The raw materials used include: PVC resin, calcium powder, DOP dioctyl ester and other auxiliary materials

  • No fading

  • no shrinkage

  • no ball

  • anti-wrinkle

  • multiple styles

News

Gathers Wuzhou's news and obtains fabric direction

MORE>>